Choosing The Right CNC Coolant For Aluminum Milling

Why Should You Consider SCTools?

CNC: How a machine monitoring system reduces investment in new machines

Increasing capacity – buy a machine or reduce downtime on existing machines using a CNC machine monitoring system ? Easy decision for a CEO !

Increasing CNC machining capacity
Downtime on the shop floor can be up to 30 % because of poor work ethics and system problems (see this earlier post). If I have 10 machines on my shop floor and I want to increase machining capacity by 20 %, I have two options:
Option 1: Buy another machine.
Option 2: Increase capacity utilization by 20 % by reducing downtime.

Option 1 is quick, painless, does not involve disrupting my current inefficient way of working. I can buy a new machine in a couple of days.
Option 2 is costs a fraction of Option 1, but is painful – involves changing work culture and improving systems.

Most organizations prefer Option 1, which increases costs and reduces profitability, but is painless. Option 2 involves putting in a productivity monitoring system that tracks your machines’ production and downtime electronically, automatically, 24/7.

Let’s say you have 10 machines each costing Rs. 25 Lakhs, a total of Rs. 2.5 Crore. You now face a capacity crunch, and need to increase capacity by 20 %. You can reduce downtime and improve capacity utilization of the existing machines by 20 %. The new machines will cost you Rs. 50 Lakhs, while an Industry 4.0 machine monitoring system will cost you Rs. 5 Lakhs. The monitoring CNC Inserts system can typically improve your capacity utilization by 20 % in 3 months. It can do this at 10 % of the investment in new machines.

Action point

The next time you have a capacity constraint and want to buy a new machine, instead install a machine monitoring system like LEANworx machine monitoring software to increase capacity. Or install a monitoring system right away and dispose of some of your existing machines.

Etc.

Doggie moving up in life

I stayed in a hotel near Connaught Place in Delhi recently, for a week. While on an early morning jog (trying to shed the kilos that I was acquiring at the huge breakfast buffet spread every morning – part of the hotel’s package deal), I saw this dog sleeping on top of a parked car.

Two questions arose in my mind:
1. CCMT Insert How in hell did the guy get on top there, negotiating the slippery metal and glass ?
2. Wasn’t he uncomfortable on the hard and possibly cold metal ?

I still haven’t figured out the answer to the first question.
As for the second one, it was a warm and humid monsoon morning, and the metal was probably nice and cool compared to the ground.

And now I’m wondering whether he (being a city slicker dog) will at some point in his life think “I’m tired of sleeping on these mid-range cars. It’s time I moved up in life. Should look for a Benz or a BMW to sleep on tonight, so I can impress the babes”. He’s actually moved up in life, literally, from sleeping on the footpath to sleeping on a car.

Interested in a Plug-and-play Industry 4.0 system ?
See LEANworx, from our group company.

Related posts:

  • Quick change tool holder systems on CNC lathes
  • CNC machining cost – how to reduce it, with zero extra investment
  • Bad CNC machine and high energy cost
  • CNC machine simulator
  • Machine downtime for trivial reasons
  • The Carbide Inserts Website: https://www.estoolcarbide.com/product/wcmt080412-u-drill-inserts-p-1209/

    Ingen kommentarer endnu

    Der er endnu ingen kommentarer til indlægget. Hvis du synes indlægget er interessant, så vær den første til at kommentere på indlægget.

    Skriv et svar

    Skriv et svar

    Din e-mailadresse vil ikke blive publiceret. Krævede felter er markeret med *

     

    Næste indlæg

    Choosing The Right CNC Coolant For Aluminum Milling